Applications

GP surgeries

Surgeries operate to fixed hours with predictable daily volumes and constant hot water demand.

How HERU fits

Recovering value on-site reduces collection movements and the operating costs attached to them.

HERU is installed as building infrastructure, alongside existing plant. Authorised materials generated on the premises are retained and used to recover useful heat for hot water and space heating, rather than being collected and taken away.

Indicative range
HERU 35 to HERU 125
How it is sized
Sized on the scale of the surgery — the patient list, the number of practitioners and the number of consulting rooms.
Recovers
Useful heat, for hot water or space heating
Installed as
Building infrastructure, on-site

Find out what HERU could recover here.

Every building is different. Tell us about the premises and we will come back to you.

Make an enquiry